Data Center 2: SLC
The Lindon V data center opened in early 2008. Since completion, this facility has embraced an attitude of research and innovation. Vast arrays of cold-aisle containment systems make the cooling systems’ power consumption extremely low. C7 is commitment to developing innovative data center technologies.
-
Hardware we use
We use a wide range of dedicated server models, most of them housed in SingleHop and Softlayer, the ability of these varies according to the population of clients either on a specific product or the needs of one in particular, all our servers are using quad-core models and up to 24GB of RAM, all hard drives in RAID construction and several daily restore points to remote offsite servers.
-
Design
-
- 10,000 sq. ft. data center floor space
- 10 Gb ports on campus
- 10 Gb connections between data centers
- Cold aisle cooling system
- Power feeds from two substations
- 30" raised floor
-
-
Certifications
-
• SAS 70 compliant
• Tier 3 classification
• 10,500 square feet
• 30" raised floor
• Advanced canopy cold row cooling
• Redundant power systems
• Redundant multi-carrier network
• VESDA smoke detection system
• 24x7 security and digital video surveillance
-
Datacenter
Datacenter SLC